A blog dedicated towards architectural refinement of buildings and environments in which we live, work, and play. Chiefly this is brought about by the author with finish carpentry at heart, and many other disciplines radiating or spinning off from it.

Showing posts with label Google Sketchup utilization. Show all posts
Showing posts with label Google Sketchup utilization. Show all posts

Wednesday, December 23, 2009

Art Gallery Space Expansion Sketches

I've drawn up some sketches of an expansion plan to The 5th Street Gallery, which is set up in the Historic Federal Building. It would incorporate parts of the old Post Office lobby that was the access to the mail boxes. It would mean either acquiring or building portable, collapsible walls, seven that would be freestanding except for attachment to one side at the pilasters, and seven that would cover the old post office box walls, making that area usable for exhibition. The usable space would be approximately 1,900 square feet total. The space is also quite well lit during the day by the high ceiling, but some sort of lighting will have to be introduced for any presentation in the evening.





Monday, March 2, 2009

Staggered Section ~ Key Piece

[In the continuing study of how to scaffold above the Historic Federal Building stairwell:]
To use the scaffold here there are three special pieces needed to add into the regular arrangement of the owner's "Brand" scaffolding:

1.) The staggered piece, with one tube 3', 4" long, and one tube 1', 6 7/8" long connected with two pieces of tubing as rails. This levels out the first section that is 6', 4" tall.
2.) Two 5 foot pieces that form the second section (which is neccesary to make clearance beneath the horizontal beam on third floor). These are the pieces that are already on hand.
3.) A 4 foot piece to get the platform above the top railling by one foot.
4.) A 7 foot piece across from that as its levelling component to the third section. (Something special will have to be arranged with the X-braces which would go through the ironwork at this point, as well as with the staggered piece.)

The key is the staggered piece that sits upon the first landing between 3rd and 4th floor.

Z

The red tubing on the bottom was a previous design to allow for leveling. I'm incorporating that now into the total height desired, and will use small wood shims if I need any adjustment there, using the opposite end of the scaffold for the coarse adjustment in levelling.

The other piece remains the same from an earlier drawing, which is basically a seven foot section attached to a four foot section at the top. This stack can be "re-cycled" up the stairs to the point where it climbs one complete six-foot section, or planked across to a "Baker" scaffold of different manufacture.

[Drawings added to illustrate this process March 13, 2009



Staggered scaffold as it would look with just a human figure for scale, above.


As it is to be used, above.

The full complement.

Share Button

Share/Bookmark

About Me

Sculptor, Designer, Resides in Southern Colorado, USA. age 65. Interested in mould-making and casting, public or outdoor sculpture presentation, and space or environments in which to present them.

Labels

My Guestbook

Facebook Verification Widget