After the roof painting project was shelved for the summer work now begins with 30 gallons of gold Hammerite in reserve. Below are some of the initial forays getting used to a repetoire with all the safety equipment, preparitory scrubbing, and rinse which required an additional 100 foot of water hose coming up from the second floor deck.




No comments:
Post a Comment